Description of the use case / service / project
Problématique / Besoin :
A Stuttgart-based automotive company faced costly production downtime due to a lack of IT and OT system integration. In 2022, these downtimes resulted in a production loss of 500 vehicles per month, representing a 15% drop in revenue. The energy inefficiency of existing equipment also led to excessive consumption of 20 MWh per month.
Méthode utilisée / Réponse apportée :
The implementation of the Lenze automation platform enabled seamless integration of IT and OT systems, reducing production downtime by 70%. The installation of decentralized solutions for conveyors and turntables simplified installation and reduced energy consumption by 30%. Thanks to Lenze BlueGreen Solutions, overall power consumption was reduced by 25%, and the use of regenerative braking energy converted 5% of the energy used into recovered energy.